日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

Global EditionASIA 中文雙語Fran?ais
Business
Home / Business / Companies

3rd phase of nuke heating service starts operations in Shandong

By ZHENG XIN | China Daily | Updated: 2023-11-28 09:40
Share
Share - WeChat
China's largest nuclear heating project starts operations in Haiyang, a county-level city of Yantai, Shandong province, on Nov 15, 2022. [Photo/CCTV]

The third phase of China's first heating project fueled by nuclear energy, covering multiple prefecture-level cities, was put into operation in Haiyang, East China's Shandong province, over the weekend, as part of the government's efforts to increase green energy supplies for heating during this winter and next spring.

The project, with a planned installed capacity of 900 megawatts, is part of No 1 Warm-U-Clear, the first commercial nuclear energy heating project in China, its operator State Power Investment Corp said.

The green energy will be provided by the Haiyang nuclear power plant, which has a heating system connected to two traditional nuclear units.

It provides green heating to Shandong province's Haiyang and Rushan through a transport pipe, it said.

The total heating area of the project will reach 12.5 million square meters this winter, which will keep about 400,000 people warm, it said.

Provinces across the nation are stepping up energy supplies to meet rising energy demand for heating during the winter.

The project will provide much-needed experience to further apply clean energy heating nationwide, said Lin Boqiang, head of the China Institute for Studies in Energy Policy at Xiamen University.

The role of nuclear power as a clean energy source for heating is expanding in the country. In the long run, this will not only reduce heating costs but also significantly improve the operational efficiency of nuclear power plants, Lin said.

The efforts in nuclear heating illustrate China's ambitions at de-carbonizing its energy-intensive heating sector, he said.

State Power Investment Corp has been stepping up efforts to expand its nuclear power-based heating projects to more areas across the country in recent years.

The company started its first phase of nuclear heating in 2019 in Shandong province, which has provided 700,000 sq m of carbon-free heating, followed by the second phase that covered 5 million sq m in 2021, it said.

Since the operation of the first phase of No 1 Warm-U-Clear in 2019, it has replaced the consumption of 390,000 metric tons of standard coal while reducing carbon dioxide emissions by 720,000 tons, SPIC said.

The first pilot nuclear heating project in southern China, which is built upon residual thermal power of China National Nuclear Corp's Qinshan nuclear power station in Zhejiang province, is also currently under operation in Haiyan county, in East China's Zhejiang province.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE
 
主站蜘蛛池模板: 欧美成人一二三区 | h片在线免费看 | 国产第一页在线观看 | 国产久精品 | 日韩在线中文字幕 | 黄色www.| 免费一级特黄特色大片 | 偷拍亚洲欧美 | 久久青青| 亚州欧美日韩 | 最新av在线免费观看 | 在线免费日韩 | 精品中文视频 | 国产九色91 | 天天干天天上 | 国产哺乳奶水91在线播放 | 亚州男人的天堂 | 超碰在线最新 | 99综合| 国产网站在线免费观看 | 精品久久久久久久久久久久 | 成人在线视频网站 | xxxxx国产 | 一级大片免费看 | 黄色av网址在线 | 一级α片免费看刺激高潮视频 | 成人免费在线看片 | 日本中文字幕网 | 伊人网国产 | 欧美三级欧美一级 | 久久国产精品无码网站 | 黄色大毛片 | 亚洲天堂中文字幕 | 黄色免费在线观看视频 | 日韩成人综合 | 五月婷婷激情五月 | 成人在线亚洲 | 久操av| 亚洲色图88| 国产精品资源站 | 青青草国产 |