日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

   

Guangdong plans nuclear power plants

By Chen Hong (China Daily)
Updated: 2006-12-25 06:54

Shenzhen: South China's Guangdong Province is planning to spend nearly 74 billion yuan (US$9.45 billion) building three major nuclear power stations by 2010.

The size of the investment will set a precedent for spending on power-generation, surpassing outlays on traditional coal-fired and hydroelectric power plants, Xinhua News Agency reported yesterday.

During the 11th Five-year Plan (2006-10), Guangdong will focus on developing the second phase of the Ling'ao Nuclear Power Station, the first phase of Yangjiang Nuclear Power Station and the first phase of Taishan Nuclear Power Station, said Chen Shanru, director of the Development and Reform Commission of Guangdong Province.

By 2020, the installed capacity of all nuclear power stations in Guangdong is expected to reach 24 million kilowatts, accounting for 60 per cent of the country's total nuclear power output.

Of the country's current installed capacity of 8.7 million kilowatts, nearly 4 million kilowatts are generated in Guangdong.

The project is part of a larger effort to restructure the province's power-supply. The project's goal is to develop more clean energy to fuel Guangdong's fast-growing economy, Chen was quoted as saying.

The province, which is home to the country's largest economy, lacks the energy resources necessary to develop traditional power stations. Guangdong imports most of its coal and petroleum from other parts of the country or from abroad.

Construction of the second phase of Ling'ao Nuclear Power Station in Shenzhen started at the end of last year.

It was the country's only nuclear power station project between 2001 and 2005. Its two 1-million-kilowatt power generators will start operating in 2010 and 2011.

Construction of the first phase of the Yangjiang Nuclear Power Station will start early next year.

The time frame for the Taishan Nuclear Power Station has not been decided yet.

Both the Yangjiang and Taishan plants are located in West Guangdong.

Chen said the province had chosen 10 sites for new nuclear power stations, and the feasibility studies have been going smoothly.

Two projects, located in Zhaoqing and Yunfu, are expected to take priority among the 10, according to the Xinhua News Agency report.

(China Daily 12/25/2006 page3)


(For more biz stories, please visit Industry Updates)



主站蜘蛛池模板: 国产精品久久久久久69 | 午夜在线观看视频网站 | 日韩久久久久久久久久久 | 午夜久久久久久久久久久 | 天堂在线视频网站 | 日韩高清国产一区在线 | 午夜影院私人 | 青青操免费在线视频 | 亚洲第一免费视频 | 91亚洲精品视频 | 国产精品偷拍 | 日韩av免费一区 | 艳母动漫在线免费观看 | 俺去啦最新网址 | 欧美黄色录像视频 | 天天操天天做 | 久久精品一二区 | 日韩综合区| 国产精品1区 | 中文字幕亚洲精品 | 国产毛片久久久久久久 | 青少年xxxxx性开放hg | 国产三区视频 | 色丁香久久 | 免费视频毛片 | 91午夜理伦私人影院 | 精品在线99| 91视频综合 | 欧美精品99久久久 | 人人插人人草 | 日韩欧美网址 | 国产xxx在线观看 | 色多多av | 在线视频中文字幕 | 午夜免费小视频 | 午夜视频 | 久久久免费网站 | 亚洲天堂婷婷 | 亚洲第一中文字幕 | 亚洲在线看| 国产视频第一页 |