日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

US EUROPE AFRICA ASIA 中文
Business / High-speed rail

How the new high-speed railway came on track

By Hu Yongqi and Xiang Mingchao in Zhengzhou and Yang Wanli in Beijing (China Daily) Updated: 2012-12-27 09:50

All HSR trains are taken to the workshop after they have covered 4,000 km or have been in service for 48 continuous hours. When the kilometers add up to 30,000 km, the trains are taken out of service for an intensive revamp.

"When a train arrives at our workshop, the maintenance engineers check it from top to bottom, including the wheels, the upper and lower electrical circuits and the high-voltage equipment. Each train is worked on by a team of 14, which has to complete all the checks and repairs in two hours and 35 minutes," said Ma Tao, deputy director of the workshop.

The maintenance engineers test 16 wheels in 30 minutes. If they encounter any damage, the engineers are only allowed to begin repairs after receiving permission from the quality-control inspectors. On the night of Dec 20, the engineers discovered that a link connecting the wheels was close to breaking point. A quality-control inspector took two minutes to assess the damage and then gave permission for the part to be replaced. He recorded the entire process on his camera and gave the old component a number for recycling.

"Usually, small parts are more easily broken. Wheels, which are 86 cm in diameter and can last for at least six months, are replaced when the diameter reduces to 79 cm, which takes about the same time," said Luo.

Engineer Cai Quan said he walks at least 15 km every night to fix trains on a predetermined line. "My wife complains that my shoes wear out much faster than my neighbors'," he said. "But that's my job."

More than 100 cameras have been installed in the workshop to monitor all the checkups and repair procedures. Engineers swipe their cards at the entrance which bears the slogan, "Zero tolerance to technical problems", and then all their moves in the workshop can be recorded. A giant screen in the monitoring center shows which engineer is working on which train. When the engineers finish their tasks, a video is prepared to aid investigations in the event of any subsequent accidents.

Drivers are the key

The railway system has upgraded equipment and new technologies. At Zhengzhou East Railway Station, a new system has been built to verify high-speed train tickets through personal ID cards. Even if the passenger has lost their ticket, the system will still allow them to ride the train.

On the fifth floor of a building next to Zhengzhou Railway Station, new drivers practice in a lifesize simulation of a driver's cabin as the rails unfold on an enormous white screen in front of them. Once initiated, the system can offer the drivers eight courses of action to follow and provides changing routes on the screen. A speed limit is set and the drivers learn to take the appropriate course of action when the light on the panel changes color.

Guo Xiansheng, a 33-year-old who now drives the route between Zhengzhou and Wuhan, capital of Hubei province, said the system has helped him follow standard operating procedures.

How the new high-speed railway came on track

An attendant hands a brochure to a passenger on the Beijing-Guangzhou high speed train which went into operation on Wednesday. Wang Zhongju / China News Service

Hot Topics

Editor's Picks
...
主站蜘蛛池模板: 黄色一级片免费 | 久久久久久夜 | 国产www网站| 四虎影视在线免费观看 | 日韩一区二区不卡 | 第四色激情网 | 五月天久久婷婷 | 日日夜夜免费精品视频 | 69xx免费视频 | 成人欧美一区二区三区黑人孕妇 | 欧美亚洲在线 | 日本精品在线播放 | 久久久www| 在线观看免费黄色小视频 | 中文天堂在线资源 | 中国黄色录像一级片 | 欧美三级久久 | 亚洲精品国产成人 | 国产福利第一页 | 欧美黄色片免费看 | 黄色的视频网站 | 天天插综合网 | 中文字幕在线免费播放 | 色网在线观看 | 国产网站黄色 | 日本少妇激情视频 | 中文字幕日本一区 | 天天视频黄 | 亚洲毛片在线看 | 欧美日韩视频在线播放 | 一二三区在线 | 99精品成人| 免费观看的av网站 | 亚洲免费视频一区二区 | 日本精品三区 | 91精品国产欧美一区二区 | 精品成人在线视频 | 在线a网| 17c国产精品一区二区 | 久久精品在线免费视频 | 97福利社|