日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

Make me your Homepage
left corner left corner
China Daily Website

Capital's subway system branches out

Updated: 2013-01-04 09:08
By Zheng Xin (China Daily)

Unprecedented construction of Beijing's gigantic underground transit network is expected to alleviate traffic problems that have been haunting the metropolis for decades, reports Zheng Xin.

Capital's subway system branches out

A woman takes photos at Nanluoguxiang Station on Line 6 on Sunday. The station's decoration features the traditional folk art of Beijing. Wei Xiaohao / for China Daily

The Beijing Subway has seen unprecedented construction in recent years, greatly easing traffic congestion in the Chinese capital.

Including a new line and extensions to lines, the city boasts a network of 15 lines, covering 11 districts, with 221 stations and 442 km of track.

Wang Renqiang, a leading project official of the subway's Line 6 project department of the China Railway Tunnel Group, said once everything is operational, the updated network will make it easier for people to get around and provide relief to transport services on the ground.

The Beijing Subway is the busiest on the Chinese mainland in terms of passenger volume, and the largest in terms of operational length.

It is estimated the total operational length of the Beijing system will reach 1,050 km by the end of 2020, with 30 lines and some 450 stations, according to the Beijing government.

The four new services, which started operating on Dec 30, are Line 6, which connects the east and west of the capital; an extension to Line 10, which will form the capital's second loop line once finished; an extension to Line 8, which connects the city center and northern suburbs; and an extension to Line 9 to serve Beijing West Railway Station.

Capital's subway system branches out

Line 6 will eventually be 52 km long and boast 32 stations, according to the Beijing Municipal Commission of Transport. This involves three phases, with the entire route becoming operational by the end of 2015.

The first phase is 30.4 km long, with 20 underground stations, while the second will cover another 12.4 km, with seven stations.

According to the commission, the government has so far invested about 18.4 billion yuan ($3 billion) in Line 6, with some 16.6 billion yuan going into the first phase.

Capital's subway system branches out

The first phase runs from Wuluju in Haidian district in the west of the capital to Caofang in Chaoyang district in the east. Trains can accommodate 1,960 passengers on a single trip, more than can be carried on a single trip on any of the capital's other subway lines.

It is also the fastest line on the system, with trains running at a maximum speed of 100 kph, compared to the current highest speed of 80 kph. Trains will take 48 minutes to travel the whole line.

One of the reasons for the speed is that stations are far apart, with the longest distance between two consecutive stations being four km.

In addition to its capacity and speed, Line 6 also features the deepest station on the system, with the connection to Dongsi Station on Line 5 being 34 meters underground.

The city's subway system is under considerable pressure, with serious overcrowding during rush hours, partly because of the ticket price of just 2 yuan (31 cents) regardless of the length of journey.

Contact the writer at zhengxin@chinadaily.com.cn

 
 
...
主站蜘蛛池模板: 中文字幕一区二区三 | 视频在线观看91 | 久久伊人草| 中文字幕二 | 天天性综合 | 日本成人一区 | 夜夜嗨av一区二区三区网页 | 久久久精品国产 | 国产亚洲欧美精品久久久www | 欧美日韩中文字幕一区二区三区 | 欧美最猛性xxxx| 怡红院欧美 | 五月天综合 | 黄色免费小网站 | www婷婷| 亚洲欧美日韩中文字幕在线观看 | 国产精品美女在线 | av在线成人 | 午夜激情视频网站 | 亚洲色图视频在线 | 成年黄色片 | 亚洲视频一二三 | 91看片在线播放 | 国产亚洲精品精品精品 | 黄色国产在线观看 | 午夜剧场av | 男人的天堂免费视频 | 91狠狠操 | 日韩av在线资源 | 成人字幕| 97免费公开视频 | 国产一区二区三区视频 | 色婷婷婷婷 | 人人草人人爱 | 国产美女免费网站 | 男人影院在线观看 | 精品国内自产拍在线观看视频 | 日韩在线视频免费观看 | 最新日韩av在线 | 国产a免费视频 | 一级黄色片网址 |