日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

US EUROPE AFRICA ASIA 中文
Business / High-speed rail

How the new high-speed railway came on track

By Hu Yongqi and Xiang Mingchao in Zhengzhou and Yang Wanli in Beijing (China Daily) Updated: 2012-12-27 09:50

All HSR trains are taken to the workshop after they have covered 4,000 km or have been in service for 48 continuous hours. When the kilometers add up to 30,000 km, the trains are taken out of service for an intensive revamp.

"When a train arrives at our workshop, the maintenance engineers check it from top to bottom, including the wheels, the upper and lower electrical circuits and the high-voltage equipment. Each train is worked on by a team of 14, which has to complete all the checks and repairs in two hours and 35 minutes," said Ma Tao, deputy director of the workshop.

The maintenance engineers test 16 wheels in 30 minutes. If they encounter any damage, the engineers are only allowed to begin repairs after receiving permission from the quality-control inspectors. On the night of Dec 20, the engineers discovered that a link connecting the wheels was close to breaking point. A quality-control inspector took two minutes to assess the damage and then gave permission for the part to be replaced. He recorded the entire process on his camera and gave the old component a number for recycling.

"Usually, small parts are more easily broken. Wheels, which are 86 cm in diameter and can last for at least six months, are replaced when the diameter reduces to 79 cm, which takes about the same time," said Luo.

Engineer Cai Quan said he walks at least 15 km every night to fix trains on a predetermined line. "My wife complains that my shoes wear out much faster than my neighbors'," he said. "But that's my job."

More than 100 cameras have been installed in the workshop to monitor all the checkups and repair procedures. Engineers swipe their cards at the entrance which bears the slogan, "Zero tolerance to technical problems", and then all their moves in the workshop can be recorded. A giant screen in the monitoring center shows which engineer is working on which train. When the engineers finish their tasks, a video is prepared to aid investigations in the event of any subsequent accidents.

Drivers are the key

The railway system has upgraded equipment and new technologies. At Zhengzhou East Railway Station, a new system has been built to verify high-speed train tickets through personal ID cards. Even if the passenger has lost their ticket, the system will still allow them to ride the train.

On the fifth floor of a building next to Zhengzhou Railway Station, new drivers practice in a lifesize simulation of a driver's cabin as the rails unfold on an enormous white screen in front of them. Once initiated, the system can offer the drivers eight courses of action to follow and provides changing routes on the screen. A speed limit is set and the drivers learn to take the appropriate course of action when the light on the panel changes color.

Guo Xiansheng, a 33-year-old who now drives the route between Zhengzhou and Wuhan, capital of Hubei province, said the system has helped him follow standard operating procedures.

How the new high-speed railway came on track

An attendant hands a brochure to a passenger on the Beijing-Guangzhou high speed train which went into operation on Wednesday. Wang Zhongju / China News Service

Hot Topics

Editor's Picks
...
主站蜘蛛池模板: 99热欧美| 日韩一区二区三区四区在线 | 午夜影院体验区 | 国产高清91 | 色婷婷激情五月 | 中文字幕视频一区二区 | 欧美aaa大片| 超碰中文字幕 | 国产成人精品一区二 | 伊人影院亚洲 | 美女午夜影院 | 大色妞av| 久久欲 | 久精品视频 | 国产一区在线播放 | 日日网站| 国产精品久久久久久亚洲影视 | 97av在线| 久久cao | 成人免费精品视频 | a在线观看视频 | 免费成人深夜小野草 | 天堂中文资源在线观看 | 天天综合国产 | 男人的天堂在线视频 | 国产啊v在线观看 | 自拍偷拍第1页 | 丁香婷婷网 | 成人黄色a级片 | 久久久www成人免费毛片 | 亚洲综合激情网 | 四虎永久在线 | 国产情侣啪啪 | 97啪啪| 欧美高清一级 | 中文字幕黄色 | 一区二区福利视频 | 亚洲精品久久久久久久久久久久久 | 丁香激情综合 | 夜夜操综合 | 日韩精品一线二线三线 |