日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

Primary work starts at Baihetan dam

By ZHENG XIN | China Daily | 2017-08-04 08:38

Primary work starts at Baihetan dam

Preparatory work for the Baihetan hydropower station, slated to be the world's second largest, is shown in Yunnan and Sichuan provinces on July 27.[Photo/VCG]

Construction started on Thursday on what is to be the world's second-largest hydropower project, the Baihetan hydropower station, which is expected to enter operation by 2022.

It will be second only to the Three Gorges dam in terms of total installed capacity, weighing in at 16 gigawatts of capacity and an average annual output of more than 62 billion kilowatt-hours, according to China Three Gorges Corp, the dam's builder.

After six years of preliminary construction, the site is ready for the main project work, including building the dam and excavating underground tunnels, the builder said on Thursday.

Experts think the operation of the Baihetan dam, on the Jinsha River, an upstream branch of the Yangtze River, will substantially boost the share of hydropower in the country's energy mix while upgrading the power structure of the country's power grid.

China is rich in hydropower resources, and the Baihetan hydropower station will represent a good utilization of those resources while reducing greenhouse gas emissions caused by coal burning, according to Wang Hao, academician with the Chinese Academy of Engineering.

"While China is currently still relying on fossil energy, clean energy and renewable energy utilization will be an important direction for China's energy consumption in the future," Wang said.

"Hydropower development in the upper reaches of Yangtze River still has a lot of potential to be further tapped."

As a major west-to-east electricity transmission project and an important move to develop China's resource-rich but otherwise poor western region, the Baihetan hydropower station, spanning Yunnan and Sichuan provinces, will meet the demand for power in both provinces, while supplying power to the East China Power Grid, Central China Power Grid and China Southern Power Grid, corporation officials said.

The station, located in Ningnan county in Sichuan and Qiaojia county in Yunnan, will replace thermal power generating capacity of more than 62.44 billion kWh and 19.68 million metric tons of coal each year. It also will reduce emissions of carbon dioxide by 51.6 million tons, sulfur dioxide by 170,000 tons, nitrogen oxide by 150,000 tons and dust by 220,000 tons each year, officials said.

The dam is built on the main stream of the lower reaches of the Jinsha River, and while it is designed mainly for power generation, other functions include flood control, improvement of downstream navigation and development of transportation via water in the reservoir area.

To meet China's goals on energy conservation and emission reductions, the country intends to reach an installed capacity for hydropower of 380 gigawatts by 2020 as it seeks cheaper and cleaner alternatives to coal and weans itself off polluting fossil fuels.

Previous 1 2 3 4 5 6 7 8 9 Next

BACK TO THE TOP
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 日本色一区 | 欧美亚洲91 | 亚洲一区二区久久 | 日韩1区2区3区 | 久久久久18 | 国产成人在线看 | 国产毛片av | 99久久久国产精品 | 国产黄频| 欧美激情精品久久久久 | 国产精品视频一区二区三区不卡 | 亚洲性激情 | 国产第一福利影院 | 久久久久亚洲 | 毛片高清 | 免费黄色小视频在线观看 | 精品免费视频 | 久久影片| 亚洲精品一区二区三区区别 | 深夜福利在线视频 | 欧美天堂一区 | a级黄色免费视频 | v天堂中文在线 | 成人网av| 色视频在线免费观看 | 欧美日韩在线观看一区 | 久久国产福利 | 亚洲一区二区视频 | 午夜导航| 亚洲一区在线播放 | 国产精品久久久久久久久久久久久久久久 | 51国产偷自视频区视频 | 日韩一级在线观看 | 四虎影院在线看 | 欧美一区二区三区啪啪 | 欧洲亚洲精品 | 成人午夜精品福利免费 | 亚洲国产精品va在线看黑人 | 欧美日韩成人一区 | 色综合88| 亚洲一区二区三区在线免费观看 |