Three phases of the Three Gorges Project
( 2003-07-01 17:31) (Chinadaily.com.cn)

Three Construction Phases

First phase, 1993-1997 (five years): Project preparation and first stage of construction, culminating in the damming of the Yangtze River in November 1997. The water of the Yangtze River was diverted through a man-made canal - the diversion channel, and the water level in the Three Gorges area rose by as much as 10 meters as a result.


Second phase, 1998-2003 (six years): The second stage culminates in the first batch of turbines beginning to generate hydropower and the permanent shiplock being put into operation. The reservoir is filled between June 1 and 15, 2003, when the water level in the Three Gorges have risen from the previous 66 meters above sea level to the current 135 meters.

TGP-Second Phase


Third phase
, 2004-2009 (six years): The project is to be completed in 2009, when all 26 generators will be operating. The water level will be raised to 156 meters in September 2006. At the completion of the project in 2009, the water level will reach 175 meters, referred to as the "normal pool level.
TGP Third Phase




   
Close  
  Go to Another Section  
     
 
 
     
  Article Tools  
     
  E-Mail This Article
Print Friendly Format
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
主站蜘蛛池模板: 小舞的淫辱日记(h)小说 | 黄色片在线免费观看视频 | 精品欧美激情精品一区 | 亚洲视频入口 | 亚洲免费小视频 | 另类一区二区 | 日韩一区二区在线免费观看 | 亚洲无av在线中文字幕 | 国产精品久久久免费观看 | 亚洲免费精品视频 | 久久精品国产精品 | 欧美中文字幕视频 | 四虎网址在线观看 | 午夜网站在线观看 | 99国产精品99久久久久久 | 99精品成人 | 亚洲一级大片 | 欧美亚洲图区 | 免费看av大片 | 国产在线一 | 四虎影库| 日韩精品免费一区二区三区 | 亚洲精品观看 | 成人a网站| 国产精品成人一区二区三区 | 在线观看精品国产 | 久热操 | 精品免费 | 精品二区视频 | 成人免费视频国产免费麻豆 | a视频免费在线观看 | 欧美视频国产 | 国产亚洲欧美日韩高清 | 欧美精品123 | 欧美日韩高清在线 | 男人的天堂中文字幕 | 黄大色黄大片女爽一次 | 性视频在线 | 国产高清视频在线观看 | 蜜桃传媒一区二区 | 综合激情亚洲 |