日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

News >China

Pollution still hinders water diversion in E China

2010-07-06 13:26

BEIJING - Authorities are still struggling with concerns about the poor water quality of the eastern route of the South-to-North Water Diversion (SNWD) project eight years after the eastern route's construction began.

Vice-Minister of Environmental Protection Zhang Lijun said thousands of polluting paper mills and alcoholic beverage factories have been shut down to improve the water quality of the world's largest water diversion project.

A State Council-approved directive issued before the eastern route's construction required local authorities to ensure the water quality is at least Grade 3, the minimum standard for water that is drinkable after treatment.

Director of the SNWD office under the State Council Zhang Jiyao was quoted as saying by Tuesday's China Daily,"There is still a long way to go before local authorities transform the eastern route into a clean-water corridor and ensure the quality won't decline again."

The construction of key pollution-control facilities is slated for the end of this year, Zhang said.

The facilities include manmade wetlands, which will purify urban waste water, and pipelines linking urban sewage treatment plants, he said.

Measures will prioritize curbing pollution caused by irregular aquaculture, rural sewage and small shipping wharfs scattered along the Grand Canal near the eastern route.

Zhang urged local authorities to monitor pollution upstream of the Danjiangkou Reservoir -- the water supply source of the SNWD's central route -- to prevent pollution from entering the reservoir or contaminating its under-construction trunk canal.

The SNWD project will take water from the massive Yangtze River in the South to satisfy demand in the North's drought-prone cities, such as Beijing and Tianjin. The eastern, central and western routes will each stretch more than 1,000 km.

Construction began on the eastern route in 2002 and a year later on the central route. The eastern route is still on the drawing board and is scheduled for completion by 2013.

The eastern route's first phase involves improving canals to connect river systems to channel water mainly through Jiangsu and Shandong -- the two provinces along the route with the worst water pollution -- to Tianjin.

All 426 pollution control projects have broken ground, and 399, or 94 percent, of them have been completed, Zhang's office reported. Two-thirds of them are operating at more than 80 percent of capacity.

The new industrial pollution control facilities have also achieved more than 90 percent of the standard for sewage discharge .

Testing in the first quarter found water quality is at least Grade 3 in 23 trunk canals, or 66 percent of the sections planned for the eastern route south of the Yellow River.

Related News:

主站蜘蛛池模板: 亚洲综合色视频 | 香蕉综合网 | 欧美黄色激情视频 | 久热亚洲| 一区二区三区日韩视频 | 日韩精品一线二线三线 | 成人爱爱视频 | 在线免费亚洲 | 夫妻性生活毛片 | 男人天堂视频网 | 亚洲免费专区 | 日本少妇aaa | 亚洲精品黄色 | 午夜影片 | 亚洲午夜一区 | 男人的天堂黄色 | 黄色小网站在线观看 | 手机看片日韩欧美 | 91视频在线观看网站 | 最近日韩中文字幕 | 欧美黄色一级生活片 | 一级免费av | 91精品国产综合久久久蜜臀粉嫩 | 成人亚洲天堂 | 成人在线欧美 | 国产盗摄一区二区三区 | 九九热在线免费观看 | 性福宝在线观看 | 91精品在线视频观看 | 国产88在线观看入口 | 一区二区国产精品 | 免费一级片视频 | 国产精品综合在线 | 香蕉视频网站 | 日韩一级精品 | 一区二区三区在线观看 | 99热免费在线 | 涩涩资源站 | 亚洲精品一级片 | 成人一区二区视频 | 一区二区三区视频 |