日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

   

Three Gorges Project to begin full operation this year

(Xinhua)
Updated: 2008-02-20 00:01

YICHANG - The Three Gorges Project will start full-scale operation this year, its developer announced on Tuesday.

The Three Gorges Project is seen in this file photo taken in Yichang, Central China's Hubei Province, May 22, 2007. [Xinhua] 

Addressing an ongoing corporate work conference in Hubei Province, Li Yong'an, China Three Gorges Project Corporation (CTGPC) general manager, said principal work would be completed in late 2008, one year ahead of schedule.

He said workers had finished all transmission facilities and would fully complete the relocation task before the summer flood season starts on the Yangtze River. They have been installing a ship lift and the final five turbogenerators, all of which are on the river's southern bank.

The Three Gorges, which consist of the Qutang, Wuxia and Xiling gorges, extends for about 200 kilometers on the upper and middle reaches of the river. They are a popular tourist destination, known for their natural beauty and historical and cultural relics.

China launched the Three Gorges Project, a multifunction water control facility, in 1993, with a budget of US$22.5 billion.

According to the original plan, the project requires the construction of key facilities, including a gigantic dam, a five-tier lock, a ship lift and 26 turbo-generators. It has involved the relocation of at least 1.2 million residents.

The 26 turbogenerators -- 14 on the northern bank and 12 on the southern bank -- have a designed annual capacity of 84.7 billion kilowatt hours of electricity.

The project is intended to reduce the threat of floods on the Yangtze from once every 10 years to once every 100 years.

To date, workers have completed installation of 21 generators on both banks of the Yangtze, according to Li.

Last year, CTGPC generated 77.07 billion kwh of electricity and recorded 12.94 billion yuan (about US$1.77 billion) in profit, 78 percent more than the targeted profit. It plans to generate 88.15 billion kwh of hydropower this year, with a profit target of 12.46 billion yuan.

   1 2   


Top China News  
Today's Top News  
Most Commented/Read Stories in 48 Hours
主站蜘蛛池模板: 成人av在线影院 | 色吊丝欧美 | 亚洲资源网| 中文字幕在线观看一区二区 | aaa一区二区 | 草草草在线观看 | 亚洲天堂中文 | 伊人网大 | 夜色在线影院 | 国产福利精品视频 | 亚洲午夜久久久久久久久红桃 | 精品中文字幕在线观看 | 欧美成人一二三区 | 黄色片网站在线播放 | 谁有毛片网站 | 成年人视频软件 | 久久天天躁狠狠躁夜夜躁2014 | 成人精品毛片 | 岛国精品在线 | 国产精品网站视频 | 精品一区二区三区免费 | 亚洲国产一区二区在线 | 国产精品视频区 | 欧美日皮| 亚洲天堂精品在线观看 | av在线免费观看不卡 | 久久国产一区二区 | 精品国产一区二区三区久久久蜜月 | 91精品福利 | 在线成人小视频 | 久操久操久操 | 亚洲欧美国产精品专区久久 | 亚洲二区在线视频 | 一区二区三区在线观看视频 | 伊人亚洲综合 | 香蕉视频成人在线观看 | 黄色一级大片免费版 | 日韩不卡中文字幕 | 黄色片在线播放 | 国产毛片视频 | 国产黄色在线 |