日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

   

100 die or missing in bridge collapses in Vietnam

(Xinhua)
Updated: 2007-09-26 17:16

HANOI -- An approach ramp in Vietnam's southern Vinh Long province leading to the Can Tho bridge, the longest bridge in the country's southern Mekong Delta under construction, collapsed Wednesday morning, killing or leaving missing some 100 people.

Rescue workers try to search for survivors of a collapsed bridge in southern Vinh Long province, Vietnam on Wednesday Sept, 26, 2007. [AP]

An 87-meter section of the ramp, whose concrete was cast Tuesday, collapsed, killing at least 20 workers, and injuring over 100 others, according to sources from the People's Committee of Vinh Long and hospitals in southern Can Tho city.

When the section collapsed, around 100 people were working under the ramp, and some 150 others on the ramp. Those working under the ramp faced high risk of fatality, while the people working on it were injured, the sources said, noting the people are staff of a partnership comprising three Japanese firms: Taisei, Kazima and Nipponsteel.

According to initial investigation, the section, 30 meters above the ground, collapsed after a scaffold system supporting the section fell. According to a local construction engineer, the collapse could have been caused by the fact that rain over the past few days has affected the foundation.

Over 100 people have been hospitalized in Can Tho and Vinh Long. Most of them suffered head, arm and leg injuries. Local agencies are striving to search for people trapped in the section's ruins, the sources said.

Construction of approach ramps and the cable-braced bridge's main span over the Hau River, linking Can Tho and Vinh Long, began in September 2004 with investment of over 4.8 trillion Vietnamese dong (US$302 million) from official development assistance of Japan and the Vietnamese government's reciprocal investment. It is scheduled to be complete in 2008.

The six-lane bridge will be 2.7 km long, including the 550-meter main span and approach ramps, and 24.9-meter wide. Approach roads measuring over 12.6 km will bring the bridges total length to 15.4 km.


Top World News  
Today's Top News  
Most Commented/Read Stories in 48 Hours
主站蜘蛛池模板: 免费视频久久久 | 亚洲一区二区视频在线 | 日本a天堂| 高清一区二区 | 哥布林的洞窟在线观看 | 国内自拍视频在线播放 | 国产黄色免费大片 | 久久夫妻视频 | 四虎黄色影视 | 毛片在线免费 | 国产精品综合久久久久久 | 国产黄大片 | 欧美精品久久久 | 手机免费观看av | 韩日精品视频 | 日韩av免费在线看 | 久操伊人网 | 波多野结衣家庭教师 | 久草成人在线视频 | 经典一区二区 | 国产黄视频在线观看 | 国产原创麻豆 | 日本欧美在线视频 | 亚洲欧洲久久 | 91中文字幕在线 | av男人天堂网 | 亚洲二三区 | 一区二区三区中文字幕 | 精品国内自产拍在线观看视频 | 亚洲天堂影视 | 日韩精品视 | 色中文字幕 | 四虎影院永久在线 | 久久免费精品视频 | 黄色片视频在线观看 | 黄色一区二区三区四区 | 欧美xx孕妇| 国产精品精品软件视频 | 黄色一级在线观看 | 欧美特级一级片 | 天天干国产 |